What a really easy day today, Changed a fuse box with a dual rcd wylex consumer unit today. The job could not have been easier !! The main head had PME ( Protective Multiple Earthing ) and the main gas meter and main water incommer were both in the cupboard where the head was possitioned. I wish all consumer unit changes were as straight forward, lol !!